Floor installation method
1, basic requirements and processing
1.1. The basic requirements are solid and flat, but no waterproof treatment is required. (cement, asphalt base)
1.2. Before construction, clean up the debris on the site, check the flatness of the site, 3 meters on the ruler, and the flatness within 3 mm is acceptable. Base level lifts are treated with a large sander.
5.1.3. For leveling and cracking in places with obvious height difference, caulking is required (concrete leveling or caulking with 20- to 40-gauge quartz sand with air-permeable track glue, mix and stir in a ratio of 1:5. Aluminium scrapers are scraped and can be cured in accordance with the current temperature after 48 hours).
5.1.4. Place payoff: According to the size of the construction site type, it is confirmed that the main site sub-field fixed-line payout.
5.2 Installation Method and Description of Assembled Floor
Floor installation
5.2.1. Use the upper left corner of the site as the installation starting point and the floor A corner as the top left corner of the site (as shown in the figure).
5.2.2, from left to right, align the floor pins and buckles, and use a rubber hammer to strike the fastening buckle (as shown in the figure).
(figure 1)
(figure 2)
5.2.3. If the ground is an irregular shape, it is necessary to cut the floor block on site according to the ground conditions in order to achieve the desired effect.
5.2.4. Floor Installation Method
Install the edges of the floor (note the orientation of the floor and the floor, the part with the pin on the floor is connected with the two-sided floor, the part with the hole is connected with the single-ear floor), the buckle on the floor and the The pins of the floor are connected with rubber hammers (as shown in the figure).
(figure 2)
5.2.5, installing the four corners of the floor
5.2.6 Installation Notes
The floor pins and buckles must be aligned during installation to avoid damaging the floor (as shown).
(figure 1)
(figure 2)
5.3. Installation Method of Group Flooring Blocks
5.3.1. Use the upper left corner of the site as the installation starting point. Take the floor A corner as the top left corner of the site (as shown)
5.3.2. From left to right, align the floor pins with the buckles, and use a rubber hammer to strike the anchors (as shown).
(figure 1)
(figure 2)
(image 3)
(Figure 4)
(Figure 5)
5.3.3. If the ground is an irregular shape, it is necessary to cut the floor block on site according to the ground conditions in order to achieve the desired effect.