The decoration acceptance is revealed, and one detail is not missed.

The process of renovating a new home is painful, although there are times when you are happy. After each part of the renovation is completed, it is in the verification phase. Don't think that the acceptance is just a look at the touch, if the quality is not strict, the last one is still yourself. If you are not assured of your acceptance, you can also ask a third-party supervision company to come and help.

1, the three most common problems

In the decoration inspection room, the most easy to see the problem is the ceiling and wall tiles, the problem is also the most, the incidence rate is as high as 25%, mainly in the wall ceiling, there are brush marks, bumps, falling, late product protection, resulting in secondary damage Wait for these questions. Wall tiles are also the "hardest hit" of decoration. There are mainly problems such as lack of corners, damage, loose joints, empty drums, poor materials, unevenness, and insufficient protection of finished products.

2, the wires inside the wall should not be ignored

The wires hidden in the wall switch are often neglected. After the decoration, many consumers use some water heaters and air conditioners that consume a lot of power, and the switches and sockets are heated or even burned. It is very likely that the electrician will not be connected according to the construction requirements when installing the sockets, switches and lamps. When checking in summer, be sure to check if the wiring is qualified and whether it is hot during use.

3, concealed engineering to prevent hidden dangers

Checking whether there are dedicated levels and saddle cards in the hydropower pipeline is also one of the experiences to examine the difference between professional hydropower and cottage teams. The nodes for mutual assistance acceptance after the start of construction are: before the hydropower transformation ends, the wall and floor tiles are laid, and the ground and wall are leveled before painting. The walls of the kitchen and the bathroom need to be installed with the impact drill and the mirror cabinet. When you are nailing a wooden wedge, you must pay attention to the direction of the water and electricity pipeline; do not pierce the pipeline, the threaded pipe of the wire is the shortest distance from point to point; if you walk 90 degrees, it is deliberately wound.

4, the sewer pipe should be smooth

At the time of acceptance, the sewer line must be inspected. A few construction teams may directly pour the concrete fragments containing a large amount of cement and sand into the sewer, thus causing the problem of unsatisfactory sewer pipes in the future. After the construction of the waterway is completed, fill all the basins, basins and bathtubs with water to see if the sewer line is unobstructed.

5, the substrate treatment should be done well

Before applying latex paint and paving wall tiles, be sure to do the substrate or floor treatment. For new houses, the substrate treatment generally only needs to be sanded with coarse sandpaper, and it is not necessary to remove the original paint layer. On the wall of an ordinary old house, the original paint surface needs to be removed before the next process can be carried out. In the paving construction of wall tiles, you should pay attention to the tiles can not be directly placed on the surface of lime mortar, lime paste, paper lime paste, hemp mortar and latex paint.

6, the water and electricity lines should be clear

Nowadays, home decoration generally chooses to bury the pipeline, and it must be grooved on the wall and the ground before it can be buried. Before the construction, confirm with the construction team leader about the direction and position of the pipeline. Slotting requirements are different for different wall structures. The load-bearing wall in the house is not allowed to be grooved, and the wall with the insulation layer is easily cracked on the surface after being grooved. Be careful when grooving the ground, and do not damage the slab to cause trouble to the residents downstairs. In addition, the decoration company must leave a “pipeline diagram”, draw the direction of the wire and the specific location, indicate the orientation of the upper floor, the ground and the adjacent wall, and indicate the joint position of the pipeline.

BROW

Long-Lasting Eyebrow Gel,Eyebrow Setting Gel,Long-Lasting Eyebrow Fixer,Eyebrow Setting Mascara

Guangzhou believe cosmetics co.,ltd , https://www.believecosmetics2010.com

Posted on