Elastic acrylic construction solution
1. After the construction area is determined, clean up, clean, remove oil, cement slag and debris, roll the bottom layer.
2. LATICPAVE high-grade mortar with strong adhesion to the cement base is used to apply two coats of coarse rubber granules to a thickness of 2-3 mm to form an elastic buffer layer.
3. The rubber powder and the glue are used to scrape the coating twice to reach a thickness of 4mm to form an elastic cushion layer.
4, with LATICPAVE senior elastic paint scraped again, forming a top layer.
5. In the main and sub-fields, use 60-120mesh quartz sand and LATICPAVE color elastic paint to mix and scrape and paint twice to build a non-slip texture layer.
6. Scratch again with LATICPAVE color paint to build a protective surface.
7, with white line painting line
Hard acrylic tennis court construction plan
Use LATICPAVE brand court paint to lay the entire coating layer of the bottom material layer, texture layer and colored surface layer and use white line oil for marking.
Acrylic surface construction began 15 days after cement foundation maintenance
1, clear the base layer of garbage.
2, the stadium dedicated sealant processing based on the expansion joints and other joints. If there is a basic cracking phenomenon, special treatment must be adopted.
3. Etch the surface with dilute hydrochloric acid and clean it with clean water.
4. Lay the first coat.
5, test the water leveling, find the water area, according to the standard to determine the need to fill the water. Fix the place with the Laticpave tennis base repairs.
6, the second test water leveling. Use the method described above to determine the water accumulation area until both parties are satisfied.
7. Apply a second layer of undercoating to polish the construction marks and uneven areas.
8. The venue will be separated from the competition area and buffer area, and use different colors Laticpave paint construction.
9. Sub-zone color paint is divided into secondary constructions to reach a thickness of 1.0-1.5mm.
10. Use white line oil to draw out the tennis line.
Standard Course Size Area Table Quick List
Length (m) | Width (m) | area | |
5-person system football field | 40 | 20 | 800.00 |
40.0+{2.0 (buffer)×2}=44 | 20.0+{1.0 (Buffer)×2}=22 | 968.00 | |
7 person system foot | 65 | 45 | 2925.00 |
65.0+{2.0 (Buffer)×2}=69 | 45.0+{1.0 (Buffer)×2}=47 | 3243.00 | |
11-person system football field | 105 | 68 | 7140.00 |
105.0+{2.0 (Buffer)×2}=109 | 68.0+{2.0 (buffer)×2}=72 | 7848.00 | |
tennis court | 23.77 | 10.97 | 260.76 |
23.77 + {6.4 (buffer) × 2} = 36.57 | 10.97+{3.65 (buffer)×2}=18.27 | 668.134 | |
Basketball court | 28 | 15 | 420.00 |
28.0+{2.0 (buffer)×2}=32 | 15.0+{2.0 (buffer)×2}=19 | 608.00 | |
Volleyball court | 18 | 9 | 162.00 |
18.0+{9.0 (Buffer)×2}=36 | 9.0+{6.0 (buffer)×2}=21 | 756.00 | |
badminton court | Singles 13.4 + {2.0 (buffer) × 2} = 17.4 | 5.18+{2.0 (buffer)×2}=9.18 | 159.73 |
Doubles 13.4 + {2.0 (buffer) × 2} = 17.4 | 6.10+{2.0 (buffer)×2}=10.10 | 175.74 | |
Hockey Field | 91.4 | 55 | 5027.00 |
91.4+{2.0 (buffer)×2}=95.4 | 55+{1.0 (buffer)×2}=57.0 | 5437.80 | |
Handball court | 40 | 20 | 800.00 |
40.0+{2.0 (buffer)×2}=44 | 20.0+{1.0 (Buffer)×2}=22 | 968.00 |
Related Reading""
Flexible acrylic tennis court construction process